Click here to make tpub.com your Home Page

Page Title: NOTES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

2E + Bays
18
19
20
21
22
L/Nose
8N1
6N1+
6N1 +
6N1 +
6N1 +
3N2
3N2
3N2
3N2
Launch
(8p4)
(9p0)
(9p7)
(10p3)
(10p7)
Position
LZ 5
LZ 2
LZ 4
LZ 5
LZ 6
LRP
Note b
Note b
Note b
Note b
Note b
Launch
15p5
16P5
17P5
18P5
19P5
Remove
FRB
FRB
FRB
FRB
FRB
RRB
RRB
RRB
RRB
RRB
Compl. by
Note c,d
Note c,d
Note c,d
Note c,d
Note c,d
NOTES:
a.
Add LNCG posts, LNCG and nose roller.
b.
Check that LR is under LZ given or higher. Remove nose sections
as they pass LRP, observing minimum 5 ft (1.5 m) overhang.
Leave last three nose sections in place until far bank end of bridge
has been lowered to ground.
c.  Launch until far bank end of bridge is 9 in (23 cm) from LRP, or
end of ETP overhangs CRB by 1.5 ft. (0.5 m).
d.  Put bridge on ground.
*  Add given length of launching nose with LRP secured with tie
down strap.
** Nose completed by adding 8th LNH or 6 LNH required for 3N2
(double-story nose).
[ ]  Counterweight.
( )  Center of gravity.
2-21

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business