Quantcast Figure 4-20. Decking, removal and installation.

 

Click here to make tpub.com your Home Page

Page Title: Figure 4-20. Decking, removal and installation.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Figure 4-19. Quick disconnect couplings. removal and installation. (sheet 1 of 2) - TM-5-5420-205-140055
Up
TM-5-5420-205-14 Superstructure Interior Bay Mobile Floating Assault Bridge/Ferry NSN
Next
Figure 4-21. Curb arm and rod, removal and installation.
TM 5-5420-205-14
4-29. Curbing Mechanism, End and Interior Bay
a.
Curb Arm and Rod Replacement. Refer to
figure 4-21 for removal and installation of the curb arm
and rod.
b.
Curbing and Torsion Shaft, and Ramp
Bracket. Refer to figure 4-22(1) thru (3) for removal and
installation of the curbing and torsion shaft, and ramp
bracket.
Figure 4-20. Decking, removal and installation.
4-27

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business