Click here to make tpub.com your Home Page

Page Title: COST ESTIMATING GUIDE FOR LAYAWAY OF IPE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 38-260
7. Estimates for processing, packaging, packing, and loading of tooling are calculated by determining the replacement
value of the tooling and manufacturing aids not standard to the basic machine and multiplying this quantity by 6 percent
or .06.
8. The average cost for transporting machine tools by truck is $1.02 per mile regardless of weight, with a maximum
truckload of 45,000 pounds. Rates are averages and vary greatly by shipping origin and destination. Multiply $1.02 by the
number of miles the truck must travel to deposit the equipment in storage to obtain the truck transportation estimate.
9.
Total all costs for material, labor, tooling, and transportation. Two examples are provided in this appendix.
COST ESTIMATING GUIDE FOR LAYAWAY OF IPE
3 Ton
6 Ton
12 Ton
(4,000-8,000 lbs)
(8,001-16,000 lbs)
(16,001-32,000 lbs)
MAN
MAN
MAN
LAYAWAY ACTION
HOURS MATERIAL HOURS MATERIAL
1. FLUSH
6
65.00
8
75.00
15
162.00
2. DISCONNECT
4
6.00
4
12.00
6
21.00
3. CLEAN EXTERIOR
4
18.00
5
28.00
8
47.00
4. DISASSEMBLY
-CLEAN-REASSEMBLY
42
38.00
66
60.00
78
81.00
5. PRESERVE LEVEL " "
A
8
65.00
14
159.00
20
224.00
6. PRESERVE LEVEL " "
C
5
38.00
6
60.00
8
81.00
7. MOVE TO SKID & BOX
AREA
2
31.00
6
53.00
10
79.00
8. SKID & BOX (ALUM SKID)
12
38.00
14
49.00
22
60.00
9. SKID & BOX (WOOD SKID)
20
405.00
20
1235.00
32
1500.00
10. MOVE TO LOADING DOCK
2
24.00
4
34.00
6
49.00
11. LOAD & BRACE (TRUCK)
3
43.00
5
53.00
6
63.00
12. LOAD & BRACE (RAIL)
8
65.00
14
117.00
20
172.00
13. SHROUD (POLYETHYLENE)
3
21.00
6
37.00
12
63.00
14. MOVE TO STORAGE
AREAS-LEVEL
3
27.00
6
47.00
8
71.00
15. RECORDS & OFFICE
4
18.00
4
18.00
4
18.00
16. INCIDENTALS/MISC
4
13.00
4
13.00
4
13.00
NOTE: This cost estimating guide does not provide estimating factors for the following:
1. Receiving & placement charges.
10. Rolling stock.
2. Shipment by barge.
11. Electronic & communications equipment.
3. Analytical Inspection.
12. Plant rehabilitation.
4. Presses.
13. Electric power components.
5. Elephant tools.
14. Numerically controlled equipment.
6. Furnaces.
15. Dust Collecting & abrasive or blast systems.
7. Tanks, above or below ground.
16. Glass forming & delicate items.
8. Conveyors.
17. Special test equipment.
9. Cranes.
18. Non-severables.
B-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business