Click here to make tpub.com your Home Page

Page Title: Section IX. SAMPLE SCOPE OF WORK FOR PROCESSING INDUSTRIAL PLANT EQUIPMENT FROM USE TO CONTROLLED HUMIDITY STORAGE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 38-260
n. Complex items should be prepared and stored in accordance with the manufacturer's specifications. In many
instances, it is advisable to solicit the services of the manufacturer's technical representative.
4-33. SEQUENTIAL CLEANING AND PRESERVATION PROCEDURES
Follow sequential cleaning and preservation procedures listed in paragraphs 3-3a through d.
Section IX. SAMPLE SCOPE OF WORK FOR PROCESSING INDUSTRIAL PLANT
EQUIPMENT FROM USE TO CONTROLLED HUMIDITY STORAGE
4-34. PRODUCTION PHASE DOWN
Follow production phase down guidance in paragraphs 4-31 a through c.
4-35. GENERAL INSTRUCTIONS
Follow the general instructions as specified in paragraphs 4-32a through c.
4-36. SEQUENTIAL CLEANING AND PRESERVATION PROCEDURES
a. Follow sequential cleaning and preservation procedures in the order in which they are listed in paragraphs 3-3a
through d.
(I) Hydraulic systems.  Wash down reservoirs, filtering devices and any other accessible hydraulic fluid
chambers with hydraulic fluid and drain. All hydraulic fluid in voids, pump, sumps, and lines should be removed with a
suction pump. If the filter is a throwaway type, discard and replace. (Refer to paragraph 4-7q for processing of hydraulic
systems. )
(2) All hydraulic systems drained and/or cleaned shall be preserved with preservative oil P-10, type I, grade 10,
of table 2-1. This may be accomplished by spraying, fogging, or flushing. External precision and unpainted surfaces
shall be cleaned and dried in accordance with chapter 2 and preserved with preservative compound P-2, P-3, P-19, or P-
21 of table 2-1. Damaged exterior painted surfaces shall be processed in accordance with paragraph 4-7t.
(3) Pressure type grease fittings shall be purged of the present lubricant and charged with preservative grease
P- 11 of table 2-1.
(4) Wipers used on slides and carriages shall be removed and replaced with new ones. They shall be placed
on the original location on the machine. All protective type seals on components such as spindles and shafts shall be
removed, thoroughly cleaned or replaced, saturated with preservative P- 10, type I, grade 30, of table 2-1 and returned to
their original location on the machine.
4-33

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business