Click here to make tpub.com your Home Page

Page Title: Voltage Regulator A1 Component Removal and Replacement.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 32-5865-218-24&P
Refer to section V of this chapter.
(5)
Refer
j.  Voltage Regulator A1 Component Removal and Replacement.
to figure 5-15 and proceed as follows:
Remove voltage regulator A1 in accordance with paragraph
(1)
Tag wires on
Remove screw lock assembly (1) on J1 (2).
(2)
Remove stan-
J1, cut heatshrink (3), and desolder wires.
doffs (4) from A1.
To remove C1 (27), C2 (28), C3 (29), C4 (30), R1 (31), or
(3)
R2(32), tag location and connection and desolder.
Tag and desolder all wiring connected to the terminal
(4)
stud(s) to be removed.
Remove terminals E3 (5), E5 (6) E6 (7)F or E7 (8) by
(5)
unscrewing terminal.
Remove terminals E1 (9), E2 (10), or E4 (11) by
(6)
unscrewing terminal and removing washer (12).
Remove terminal E11 (13) by unscrewing and removing
(7)
terminal E6 (7), then removing terminal E11.
Remove terminal E8 (20) by removing screw (21), flat
(8)
washer (22), and two nylon sleeves (23) that secure E8 to
voltage regulator A1, then removing E8.
Remove terminal E9 (14) or E10 (15) by removing nut (16)
(9)
on screw (17) holding terminal E9 to VR1 (18) or E10 to
VR2 (19), then removing E9 or E10.
(10) Remove VR1 (18) or VR2 (19) by removing E9 (on VR1) or
E10 (on VR2) in accordance with the previous step.
Remove screw (17), two flat washers (24), lock washer
(25), and nut (26) securing each end of VR1 or VR2 to A1.
Remove VR1 or VR2.
(11) To reassemble voltage regulator A1 install VR1 (18) or
VR2 (19) by securing components to A1 with a screw (17),
two flat washers (24), lock washer (25), and nut (26) at
each end.
(12) Replace terminal E9 (14) or E10 (15) by placing E9 or E10
on screw (17) holding terminal E9 to VR1 (18) or E10 to
VR2 (19), then replacing nut (16).
(13) Replace terminal E8 (20) by assembling screw (21), flat
washer (22), two nylon sleeves (23), and terminal E8 and
secure to voltage regulator A1.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business